The product, screen by screen.

Five of the surfaces an operator, a planner and a works manager use daily. Values are illustrative and internally consistent, drawn from a two shift run on a single press.

Cumulative parts and press rate on one time axis, with every stopped period marked. The flat stretches are the ones that cost money.

0live
Produced parts
80.4/ 90.0 SPM
Production rate
19,040live
Total strokes
Running
Machine status
05k10k15k20k9009:0011:0013:0015:00
RunningStoppedPartsRateTarget rate

Sample shift

Shift periods as a table
FromToStateDuration
08:4009:38Running58m
09:3810:12Stopped34m
10:1210:59Running47m
10:5912:35Stopped1h 36m
12:3513:04Running29m
13:0413:25Stopped21m
13:2514:27Running1h 02m
14:2715:53Stopped1h 26m
15:5316:35Running42m

Downtime, ranked then pivoted

Read about stamping press downtime analysis

Reasons ordered by duration, each carrying its share and its occurrence count. The same record re-reads seven ways.

State overviewBy reasonBy assetBy toolBy productBy departmentBy operator
219h 15m
Unplanned downtime, 30 days
Top 5 of 22 reasons
  • Power supply not available41h 23m
    18.9% · 16 stops
  • Coil loading22h 56m
    10.5% · 145 stops
  • Breakdown analysis17h 16m
    7.9% · 149 stops
  • Adjusting the setup15h 53m
    7.2% · 172 stops
  • Tool breakdown15h 28m
    7.1% · 27 stops

Die life against rated life

Read about tool and die management

Strokes done against strokes rated. Everything past 100 percent is drawn as overflow, because a calendar never told anyone to pull a die.

Tool life, strokes against rated life34 tools tracked
  • TL0100Cap outer388%Due
    1,164,811 of 300,000 strokes
  • TL0099_3Shutter progressive385%Due
    1,924,402 of 500,000 strokes
  • TL0020UC stator cover335%Due
    1,005,874 of 300,000 strokes
  • TL0206Contact terminal316%Due
    315,741 of 100,000 strokes
  • TL0064Terminal lug77%
    214,880 of 280,000 strokes

Presses on one timeline with setup drawn separately from production, so changeover is something you can plan around rather than discover.

Tuesday, one shift5 of 12 presses
08:0009:0010:0011:0012:0013:0014:0015:0016:0017:00
  • MC001
    SNX-63
    SFG0131_08SetupSFG0117_09
  • MC002
    HSNXR-45
    SFG0018_08SFG0019A_0
  • MC003
    HSNX-45
    SFG0005_08SetupSFG0138B_0
  • MC004
    SNX-45
    SFG0151_08SFG0151_07
  • MC005
    HSNX-35
    SFG0001A_0SFG0025_08
CompletedIn progressSetupPartialNow

A part outside tolerance but inside its absolute bound is recorded as partial, not scrap. The results table carries that column for real.

Formed heightTarget 12.40 mm · tolerance ±0.05 · absolute ±0.12
FailPartialPassPartialFail
12.48
12.2812.3512.4512.52

This part measured 12.48 mm. Outside tolerance, inside the absolute bound, so it is recorded as partial rather than counted as scrap. A critical parameter escalates a partial to a fail; a non critical one does not.

Quality check results, sample work orders
Work orderProductPassPartialFailCritical
SFG0151_08Contact plate2000
SFG0015_07Cap inner big0111
SFG0041_07Retainer valve1100
SFG0009_08Bo-stator1000

Partial means outside tolerance, inside the absolute bound

See it on your own presses.

We instrument one press, run it for a month, and show you the shift record against what you thought was happening.

Book a walkthrough