Stamping Production Scheduling Software
Presses and tools sit on one timeline, and setup is drawn as its own block rather than hidden inside a job. Conflicts are detected across both resources at once, so a schedule that double books a die on two presses is caught while you are still planning rather than on the morning of the run.
- Views
- Day timeline, multi asset, multi tool
- Conflict detection
- Assets and tools together, including cross resource
- Setup
- Drawn as its own block, not folded into the job
- Statuses
- Scheduled, setup pending, in progress, partial, completed
- Updates
- Blocks change state as production runs
In the product
Five presses across one shift. Setup blocks read differently from production blocks.
Tuesday, one shift5 of 12 presses
08:0009:0010:0011:0012:0013:0014:0015:0016:0017:00
- MC001SNX-63SFG0131_08SetupSFG0117_09
- MC002HSNXR-45SFG0018_08SFG0019A_0
- MC003HSNX-45SFG0005_08SetupSFG0138B_0
- MC004SNX-45SFG0151_08SFG0151_07
- MC005HSNX-35SFG0001A_0SFG0025_08
CompletedIn progressSetupPartialNow
What it does
- One timeline, every press
- The whole floor for a day, side by side on a shared hour grid.
- Schedule by tool
- Pivot the same day to see where each die is committed.
- Unified conflict detection
- Press and tool clashes surface together, including conflicts between the two.
- Setup made visible
- Changeover time is a block you can see and plan around.
- Live status
- Blocks move through their states as the shift runs.
- Drill to detail
- Open any block for quantities, batches and setup requirements.
How it works
Pick the combination
Asset, product and tool together, since that is what actually gets scheduled.
Place the work order
Drop it on the timeline. Conflicts against presses and dies are checked at once.
Watch it run
Setup, then production, with the block updating as strokes accumulate.
Who this is for
- A planner who schedules in a spreadsheet and finds die clashes on the day.
- A shop where changeover time is invisible until it overruns.
- An operation running one die across several presses.
Questions
- Does it schedule automatically?
- No. Planning is yours; the system detects conflicts and shows the consequences.
- Can we schedule by die rather than by press?
- Yes. The timeline pivots between assets and tools.
- Is setup time planned separately?
- Yes. Setup is its own block with its own duration.
- What happens when a job overruns?
- The block reflects actual times, and setup overrun can hold the press through the interlock.